Vertiv infrastructure helps bring NVIDIA AI Computing Capability to the Naval Postgraduate School
September 01, 2026

Integrated power, liquid cooling, racks and deployment services provide a repeatable physical infrastructure configuration for high-density AI systems
Vertiv™ EnergyCore Grid — Powering the Future of Grid-Interactive Energy
August 03, 2026

Vertiv introduces the EnergyCore Grid, a modular, utility-grade energy storage system engineered to overcome grid constraints and accelerate interconnection.
Vertiv strengthens liquid-cooling system capability with acquisition of Strategic Thermal Labs
April 27, 2026

Acquisition enhances engineering expertise for cold-plate design, server side liquid cooling and high-density thermal validation to improve system level performance, reliability, and lifecycle outcomes
Vertiv Acquires BMarko Structures to Expand Capacity for Manufactured and Converged Infrastructure Solutions
April 13, 2026

Vertiv announced the acquisition of BMarko Structures LLC, expected to strengthen our execution capacity for manufactured and converged infrastructure.
Vertiv announces expansion of manufacturing capacity spanning infrastructure solutions, power, and rack systems, to meet rising demand
March 24, 2026

New and expanded Americas manufacturing facilities to support high-density applications with solutions to drive speed of deployment and scalable infrastructure